Easton Bridge Repair - Building the New Girders


workers setting rebar
Workers at Concrete Technology in Tacoma set rebar for the second bridge girder on November 16, 2007.

overhead cranes in action
Overhead cranes are used to maneuver the steel framing into position before the concrete is poured.

Working on the new girder
Positioning the steel framing for the second girder.

shipping tag on the first girder
I-90 Easton bridge girder tagged for shipment.


Easton bridger girder
The first girder curing on the Tacoma waterfront. This photo illustrates the "bulb tee" (pdf 634kb) girder design.