Easton Bridge Repair - Building the New Girders
Workers at Concrete Technology in Tacoma set rebar for the second bridge girder on November 16, 2007.
Overhead cranes are used to maneuver the steel framing into position before the concrete is poured.
Positioning the steel framing for the second girder.
I-90 Easton bridge girder tagged for shipment.
The first girder curing on the Tacoma waterfront. This photo illustrates the "bulb tee" (pdf 634kb) girder design.